SARKARIPROPERTY.com
Search properties
Agra · Uttar Pradesh · ADA Agra

Atalpuram, Agra: ADA Agra plots draw

ADA Agra plots in Atalpuram, Agra, draw: every unit on record with its size, price and rate, the schemes open here, and how to book.

Atalpuram is the Agra Development Authority's plot township on the Gwalior highway, sold by lottery at a fixed rate per sq m in five rounds from 2025 to 2026. ADA has published no brochure or result on its own site, so every figure on this page is from news reports and says so.

Also called Atal Puram Agra, Atalpuram township, Atalpuram Agra plots

Plots1373
From
To
StatusClosed

Highlights: not published tenure

Schemes with plots in Atalpuram

AgraAtalpuramADA Agra Atalpuram Township Plot Lottery 2025-26 (as reported)Draw of lotResidentialLaunched8 Aug 2025Reg ends15 JunDraw29 Sep 2025–6 JulResultnot publishedAuthorityADA AgraProperties1,373Price-View

Atalpuram plots price list, by type, size and price

One row per type, size and price, as ADA Agra prices them. The price is fixed and allotment is by draw of lots. "Show" opens every unit in that row, with its number, area and price, right here.

ColonyTypeAreaPriceRateEMDPlots
Atalpuram1373 plots
EWS₹1.18 L
LIG₹1.48 L
MIG-1₹2.21 L
MIG-2
MIG-3₹4.42 L
HIG₹8.85 L
Super HIG

Layout plans for Atalpuram

ADA-AGRA has published 2 drawings covering Atalpuram: the colony as a whole, and each individual site inside it. Every sheet downloads on its own. These are the authority's own drawings, kept on record here whether or not a scheme is open.

Atalpuram Phase 1 layout plan: Sectors 1, 2 and 3, 44.837 ha Atalpuram Phase 1 layout plan: Sectors 1, 2 and 3, 44.837 ha Residential Sheet p. 1PNG 998 KBADA's detailed layout for Phase 1 as filed with UP-RERA (UPRERAPRJ447163/07/2025): plots by size, group housing, parks, schools and roads. Atalpuram Phase 2 layout plan: 518 plots, 45.215 ha Atalpuram Phase 2 layout plan: 518 plots, 45.215 ha Residential Sheet p. 1PNG 1.1 MBADA's layout for Phase 2 as filed with UP-RERA (UPRERAPRJ134282/10/2025).

A drawing is a record of the place, not of the auction it was published with, so these stay here after a scheme closes and any later scheme in Atalpuram shows the same files rather than a second copy.

Where Atalpuram is, and how to get there

Location and connectivityResearched · background, not from a scheme document
Drawing titleDetailed Layout Plan Phase-1. Project title: Proposed layout plan of Atal Puram Scheme, situated at Kakua and Bhandai village, Gwalior Road, Agra. Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
RERA number on the drawingNone. The drawing carries no RERA number, approval date or validity stamp. The number comes from the UP-RERA listing (see rera_no). Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Scheme gross areaGross site area 138.537 ha; existing nala and nali 1.177 ha; area of scheme 137.360 ha; Phase 1 44.837 ha Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Phase 1 sectorsSector 1 13.080 ha (29.17%), Sector 2 7.210 ha (16.08%), Sector 3 12.190 ha (27.19%), roads 10.252 ha (22.87%), utilities 2.105 ha (4.69%); total 44.837 ha Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Phase 1 land useResidential 14.804 ha 33.02%; commercial 0.510 ha 1.14%; PSP 1.450 ha 3.23%; parks and open spaces 5.185 ha 11.57%; other open areas 0.261 ha 0.58%; utilities 3.504 ha 7.81%; transportation 19.123 ha 42.65%; total 44.837 ha. Utilities appear as 2.105 ha in the area break-up and 3.504 ha in the land-use table, and the drawing does not reconcile the two. Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Plots by size (plotted development)0-35 sq.m 78; 36-50 81; 51-100 75; 101-150 172; 151-300 209; 301-400 49; 401-500 11; above 500 22. The printed total is 615, but the rows add to 697, and the 615 is exactly the sum of the first five rows, so it looks like a formula that stopped short. Newspaper counts for Phase 1 (Sector 1 322 + Sectors 2-3 374 = 696) match the 697 row sum, not 615. Both figures appear on the sheet. Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Building rules by plot size0-100 sq.m: ground coverage 75%, FAR 2.00, 1 dwelling unit (2 for 51-100). 101-300: GC 65%, FAR 1.75, 2 DU (101-150) or 4 DU (151-300). 301-500: GC 55%, FAR 1.50, 4 DU (301-400) or 5 DU (401-500). Above 500: GC 45%, FAR 1.25, 5 DU. Planned population of the plots: 9,250 Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Group housingSix rows as printed: Sector 3 GH-2 @330 DU/ha 133 units; Sector 1 GH-3, GH-5 to GH-7 @250 DU/ha 412; Sector 3 GH-1 @250 DU/ha 126; Sector 1 GH-4 @200 DU/ha 78; Sector 2 GH-1 and GH-2 @650 DU/ha 224; Sector 3 GH-2 @500 DU/ha 112. Total 1,085 units, population 5,425 (5 per unit). As printed, Sector 3 GH-2 appears twice at different densities. Sector 1 GH-1 and GH-2 (labelled EWS and 'EWS and LIG' on the map) are missing. Sector 2 has group housing rows here but none in its own land-use table. The row labels look mis-keyed, and they are recorded as printed. Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Total Phase 1 population14,675 (9,250 plotted + 5,425 group housing) Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Sector 1 land use (sq.m)Residential plots 22,477.906; group housing GH1 6,152.450, GH2 3,937.740, GH3 4,157.560, GH4 3,136.970, GH5 3,335.860, GH6 6,713.180, GH7 2,261.750 (total 29,695.510); commercial C-1 878.824; PSP 1,947.000 + 3,245.000 + 2,700.500 = 7,892.500; utility UT-1 5,250.270 + UT-2 4,653.330 = 9,903.600; green G-1 to G-14 total 21,082.358; other green 2,505.440; road 36,371.532; grand total 130,807.670 (13.08 ha) Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Sector 2 land use (sq.m)Residential plots 41,499.271; commercial C-1 608.565; PSP 1 2,603.000; green G-1 to G-6 total 8,100.390 (largest G-4 5,415.331); other green 102.001; road 19,208.118; grand total 72,121.345 (7.21 ha). No group housing in the Sector 2 table. Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Sector 3 land use (sq.m)Residential plots 45,309.211 (partly overwritten on the sheet); group housing GH1 5,038.160 + GH2 4,023.228 = 9,061.388; commercial C-1 1,023.900, C-2 1,206.220, C-3 1,386.260 (total 3,616.380); utility UT-1 4,083.000; PSP 1 4,007.020; green G-1 11,874.565, G-2 503.223, G-3 400.000, G-4 6,570.123, G-5 3,322.414 (total 22,670.325); road 33,188.857; grand total 121,936.181 (12.19 ha) Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Road widthsThe road legend lists 7, 9, 12, 18, 24, 30, 36 and 45 m roads. On the map, plot rows sit on 9 m roads, with 12 m and 18 m collectors and a 24 m road along the southern edge of Sector 1 going east. Outside the scheme: proposed MP roads of 45 m on the west and south-west sides and a 30 m MP road to the north-east. The 75 m Master Plan road and the Inner Ring Road are to the east and south. Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Legend and notesCategories: residential, group housing, PSP, commercial, garbage collection centre, green (buffer), green (township), utilities, detention pond, pathways. There is an area reserved for road widening (37.5 m from the road centre line) and a 30 m green belt. Note: 'Set back has been provided as per Section 3.4.1 of Agra Bye laws'. Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Amenities markedSector 1 has PSP-1 labelled roughly as a nursery school of about 825 sq.m and a health centre of about 825 sq.m; the text is barely legible, so treat this reading as uncertain. PSP-2 and PSP-3 carry labels that cannot be read at this resolution. Sector 2 has a PSP strip in its north-east. Sector 3 has PSP-1 in its south-west corner and a utility block UT-1 beside the large G-1 park. A detention pond (cyan) sits in Sector 5, outside Phase 1. Large utility plots (maroon) are at the Sector 1/Sector 4 corner. Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
Context on sheetThe railway line and the proposed 45 m MP road run along the west side. Bhandai village is to the west and Kakua village to the east. NH-44 (towards Mathura/Delhi) is to the south-west, with the Yamuna Expressway interchange and the Inner Ring Road to the south-east. An existing canal is on the south-west. Sectors 4 to 11 are drawn but uncoloured beyond Phase 1. Agra Development Authority (Phase 1 layout filed with UP-RERA)read 2026-09-20
WhereKakua and Bhandai villages on the Agra-Gwalior highway (NH-44), at the junction of the Inner Ring Road, Southern Bypass and Gwalior road; the Divisional Commissioner described it as at Bhandai junction on Gwalior Road. About 12 km from the Taj Mahal, 15 km from the airport, 12 km from Idgah bus stand and Agra Cantt station; Bhandai railway junction is nearby. Amar Ujala, 5 and 9 Aug 2025; 14 Feb 2026read 2026-09-20 · secondary source
Size and layoutAbout 138 ha (ETV Bharat: 138.53 ha), in 3 phases and 11 sectors per Amar Ujala; Phase 1 is about 44 ha (ETV Bharat), 45 ha (ETV Bharat, May 2025) or 46 ha (Amar Ujala) with 3 sectors. Lottery rounds covered Sectors 1 to 8. Planned: 1,430 residential plots, 18 group housing plots and 96 non-residential plots (Times of India and Amar Ujala, Aug 2025). Other totals reported: about 1,400 plots (Amar Ujala), 4,087 plots and flats including group housing (ETV Bharat), 'over 4,200 plots' (Amar Ujala, 7 Nov 2025). Amar Ujala (5 Nov 2025) also said the three phases have 7 sectors. These counts disagree. Times of India, 6 Aug 2025; Amar Ujala; ETV Bharatread 2026-09-20 · secondary source
Amenities (planned)Convention centre on a 5,000 sq m public-use plot (to be built on PPP mode), marriage lawn, club house, post office, police post/station, junior high school and inter college, health centre, CCTV, electricity substation, SCADA centre, parks. Underground electricity, water, gas and sewer lines; STP. ADA said about 400 existing trees would be kept by redesigning roads. Amar Ujala, 5 Aug 2025, 4 Aug 2025, 20 Jul 2025, 24 Nov 2025read 2026-09-20 · secondary source

ADA Agra housing in Atalpuram, scheme by scheme

Every earlier scheme with plots here, from ADA Agra's own documentsResearched · background, not from a scheme document
Round 1 - Phase 1, Sector 1Registration 2025-08-08 to 2025-09-08; draw on 2025-09-29 to 2025-09-30 at Sur Sadan auditorium, Agra (lottery by schoolchildren drawing slips, under a retired judge and a magistrate, video-recorded). 322 plots, 1842 applications, 283 allotted. By category: EWS 81 plots of 33-40 sq m; LIG 78 plots of 41-50 sq m; MIG-1 75 plots of 51-75 sq m; MIG-3 80 plots of 101-150 sq m; HIG 8 plots of 151-300 sq m. Amar Ujalaread 2026-09-20 · secondary source
Round 2 - Phase 1, Sectors 2 and 3Registration 2025-09-29 to 2025-11-07; draw on 2025-12-02 at Sur Sadan auditorium, Agra (slips drawn by schoolchildren before former district judge Dinesh Kumar; streamed on ADA's YouTube channel). 374 plots, 783 applications, 238 allotted. 238 as the ADA Vice Chairman is quoted in Agraleaks (2 Dec 2025); the same article's headline says 283. Amar Ujala (7 Jan 2026) puts Phase 1 at 521 allotted, which is 283 (Sector 1) + 238. By category: MIG-3 91 plots, 83 allotted; HIG 201 plots, 126 allotted; Super HIG 82 plots of over 250 (as reported for this round) sq m, 29 allotted. Amar Ujalaread 2026-09-20 · secondary source
Round 3 - Phase 2, Sectors 4 to 7Registration 2025-11-21 to 2025-12-22; draw on 2026-01-16 at Sur Sadan auditorium, Agra (9:30 am). 518 plots, 673 applications, 247 allotted. 247, worked out from the reported totals: Agraleaks (7 Jul 2026) put the township at 1,138 of 1,429 plots allotted after the July draw; the other four draws account for 283 + 238 + 163 + 207 = 891. Amar Ujalaread 2026-09-20 · secondary source
Round 4 - Phase 3, Sector 8Registration 2026-02-13 to 2026-03-16; draw on 2026-04-09 at Sur Sadan auditorium, Agra (slips drawn by schoolchildren before retired district judge Dinesh Kumar; streamed on ADA's YouTube channel). 215 plots, 575 applications, 163 allotted. By category: MIG-1 54 plots, 42 allotted; MIG-2 5 plots, 5 allotted; MIG-3 65 plots, 59 allotted; HIG 79 plots, 50 allotted; Super HIG 12 plots, 7 allotted. Amar Ujalaread 2026-09-20 · secondary source
Round 5 - remaining plots, Phases 1 to 3Registration 2026-05-14 to 2026-06-15; draw on 2026-07-06 at Sur Sadan auditorium, Sanjay Place, Agra (9:30 am). 462 plots, 410 applications, 207 allotted. Agraleaks, 7 Jul 2026: 207 plots allotted in the 6 Jul draw; 1,138 of the township's 1,429 plots allotted to date, 291 left. By category: EWS 19 plots of up to 40 sq m; LIG 12 plots of 41-50 sq m; MIG-1 16 plots of 51-75 sq m; MIG-3 46 plots of 101-150 sq m; HIG 198 plots of 151-300 sq m; Super HIG 171 plots of over 300 sq m. Agraleaksread 2026-09-20 · secondary source
RateResidential plots Rs 29,500 per sq m, fixed by the ADA board on 29 Jul 2025 and unchanged in every round. Group housing land Rs 44,000 per sq m (ETV Bharat) or Rs 45,000 (Amar Ujala 31 Jul 2025); commercial Rs 59,000 per sq m; public-use plots Rs 29,500. Group housing, commercial and public-use plots were to be sold by e-auction, not lottery. ETV Bharat, 29 Jul 2025; Amar Ujala, 31 Jul 2025read 2026-09-20 · secondary source
Eligibility and documentsApply online only. Upload photo, Aadhaar, PAN, affidavit, income certificate, and caste or category certificate for reserved categories. EWS: annual income up to Rs 3 lakh. LIG: Rs 3 to 6 lakh (ETV Bharat says up to Rs 6 lakh). One application per person and one category only; joint application allowed only for husband and wife. Plots sold on an 'as is where is' basis. Amar Ujala, 7 and 8 Aug 2025; ETV Bharat, 6 Aug 2025read 2026-09-20 · secondary source
Registration amount10 percent of the plot price for general applicants, 5 percent for reserved categories, paid online at registration, plus a Rs 1,100 brochure/application fee that is not refunded. The published amounts equal 10 percent (or 5 percent) of the largest plot size in each band at Rs 29,500. Amar Ujala, 7 Aug 2025 and 8 Jul 2025read 2026-09-20 · secondary source
ReservationFigures differ by report. At launch (Amar Ujala, 5 and 7 Aug 2025): SC 21 percent, ST 2 percent, OBC 27 percent, MPs, MLAs and freedom fighters 5 percent, government and security staff over 50 years 5 percent, Awas Vikas, authority, Jal Kal and municipal staff 2 percent; horizontal: disabled 5 percent, senior citizens 10 percent. Earlier (Amar Ujala, 4 and 11 Jul 2025): OBC 27, SC 21, ST 2, ex-servicemen 2, ADA and civic staff 2 percent, MPs and MLAs 2 percent, with horizontal reservation for disabled and over-60 applicants. Amar Ujalaread 2026-09-20 · secondary source
Payment after allotmentReported by ETV Bharat only (6 Aug 2025): on allotment pay 15 percent of the plot price (20 percent for reserved applicants, who paid 5 percent at registration). For LIG the remaining 75 percent is payable with 12 percent interest in 12 quarterly instalments; for EWS in 20 quarterly instalments. Late instalments attract 2 percent extra or 14 percent penal interest for the delay period. Corner plots cost 10 percent extra; freehold charge 12 percent of plot price. The plan for MIG, HIG and Super HIG plots was not published. ADA said possession within 5 years. ETV Bharat, 6 Aug 2025read 2026-09-20 · secondary source
RefundsUnsuccessful applicants get their registration amount back: within 30 days per ETV Bharat's summary of the terms; ADA told Amar Ujala 7 days (Sector 1) and 5 working days without deduction (Sectors 2-3 and Sector 8). Once a plot is allotted, the deposit is not refunded. The Rs 1,100 fee is not refunded. Refunds and cancellations for UP authorities run through the ORMS module on janhit.upda.in. Amar Ujala, 30 Sep 2025, 3 Dec 2025, 9 Apr 2026; ETV Bharat, 6 Aug 2025read 2026-09-20 · secondary source
How the lottery was runTwo boxes, one with applicant slips and one with plot slips, drawn by schoolchildren before an allotment committee, a retired judge and an administrative magistrate; video-recorded and streamed live on ADA's YouTube channel. Allotment letters were to be issued within 7 days and were being posted to homes by 9 Oct 2025. Amar Ujala, 30 Sep and 9 Oct 2025read 2026-09-20 · secondary source
Unsold plotsAfter Rounds 1 and 2, 521 plots were allotted and 175 were not, many in SC and other reserved categories with no applicants (Amar Ujala, 7 Jan 2026). By May-June 2026 ADA reported about 940 (Amar Ujala 13 May, ETV Bharat 9 Jun) or 'about 1,000' (Amar Ujala 9 Jun) plots sold, and re-offered 462 left-over plots in Round 5. The outcome of the 6 Jul 2026 draw was not found in a permitted source. Amar Ujalaread 2026-09-20 · secondary source
RERAADA told reporters that Atalpuram is registered with UP RERA (ETV Bharat, 22 May 2025; Amar Ujala, 11 and 20 Jul 2025; Phase 3 registration was in progress on 4 Aug 2025). No RERA number was published in any permitted source; see gaps. ETV Bharat; Amar Ujalaread 2026-09-20 · secondary source
Land and cost (background)ADA bought the land directly from farmers by mutual consent at four times the circle rate (Times of India). Reported land cost: about Rs 500 crore (Amar Ujala), Rs 700 crore (Amar Ujala May 2025), Rs 784 crore (ETV Bharat). Farmers held a panchayat on 1 Mar 2026 opposing expansion of the township onto more land. Times of India, 6 Aug 2025; Amar Ujala; ETV Bharatread 2026-09-20 · secondary source
Helpline and head officeResearched · background, not from a scheme document
Portal and contactsRegistration only online at www.adaagra.org.in (Atalpuram application link) and the UP Housing department's janhit.upda.in (Online Registration for Allotment). Help desk and citizen facilitation centre at ADA office, Jaipur House, Agra; helpline 0562-2510070 and 9084407890 (working days, 10 am to 5 pm); queries to ADA property section. Amar Ujala, 9 Aug 2025 and 15 May 2026read 2026-09-20 · secondary source

Layout plans and ADA Agra documents for Atalpuram

DocumentWhat it isDated
Atalpuram Phase 1 detailed layout plan (UP-RERA)Sectors 1 to 3, plots by size, group housing, land use and roads.
ADA websiteADA's site, where the Atalpuram application link was placed; no Atalpuram brochure, rules or result list was found on its announcements, upcoming-projects or projects pages on 20 Sep 2026.
Janhit portal (UP Housing and Urban Planning Department)State portal used for Atalpuram registration (ORA - Online Registration for Allotment), error correction and refunds (ORMS). The brochure downloads only after paying the Rs 1,100 fee.
UP RERA project searchSearch by district Agra to check ADA's registered projects; needs a captcha.
ADA X post on Phase 2 registrationADA's own post: Phase 2 (Sectors 4-7) registration 21 Nov to 22 Dec 2025, categories MIG-3, HIG and Super HIG, helpline numbers. Links only to the registration page.

By property type

Questions people ask

Are there government plots for sale in Atalpuram?

ADA Agra has 1373 plots on record in Atalpuram, Agra, across 1 scheme. None is open for registration right now.

What is the price of a ADA Agra plot in Atalpuram?

Prices in Atalpuram run from — to —. The authority sets the price and there is no bidding.

Is the ADA Agra scheme in Atalpuram still open?

No. Registration has closed. The figures are kept on record so you can compare them against the next scheme.

Is there a Atalpuram plot scheme open?

No. ADA Agra Atalpuram Township Plot Lottery 2025-26 (as reported) included 1373 residential plots here, and registration for it closed 15 Jun 2026. No plot is on offer in Atalpuram, Agra now.

Is Atalpuram open for registration now?

No. The last round, for 462 left-over plots, closed on 15 June 2026 and was drawn on 6 July 2026. No later Atalpuram round had been announced by 20 September 2026.

What did a plot cost?

Rs 29,500 per sq m in every round. A 40 sq m EWS plot came to Rs 11.8 lakh and a 150 sq m MIG-3 plot to Rs 44.25 lakh before corner charges, freehold charge and stamp duty.

How much did I have to deposit to apply?

10 percent of the price of the largest plot in the category (5 percent for reserved categories) plus a Rs 1,100 fee that is not refunded. In Sector 1 that was Rs 1,18,000 for EWS up to Rs 8,85,000 for HIG.

How were plots allotted?

By public lottery at Sur Sadan, Agra, with slips drawn by schoolchildren before a retired judge, streamed live on ADA's YouTube channel.

How many applied?

Sector 1: 1,842 for 322 plots. Sectors 2-3: 783 for 374. Phase 2: 673 for 518. Sector 8: 575 for 215. Last round: 410 for 462. Demand was highest for MIG plots and lowest for Super HIG.

How many plots were allotted?

About 1,138 of 1,429 plots across five draws, as reported: 283 in Sector 1 (Sep 2025), 238 in Sectors 2-3 (Dec 2025), about 247 in Sectors 4-7 (Jan 2026, worked out from the township total), 163 in Sector 8 (Apr 2026) and 207 in the left-over draw (Jul 2026), leaving 291.

If I did not win, did I get my money back?

Yes, the registration amount was refunded; ADA said within 5 working days for later rounds. The Rs 1,100 fee was not refunded. After allotment the deposit is not refundable.

What do I pay after allotment?

Per ETV Bharat, 15 percent more on allotment (20 percent for reserved), then the rest with 12 percent interest in quarterly instalments: 12 for LIG, 20 for EWS. The plan for larger plots was not published.

Where exactly is it?

Kakua and Bhandai villages on the Agra-Gwalior highway, near Bhandai junction and the Inner Ring Road, about 12 km from the Taj Mahal. It is not part of Greater Agra, which is on the Inner Ring Road at Raipur and Rahankalan.

Who do I contact?

ADA office, Jaipur House, Agra; helpline 0562-2510070 or 9084407890, working days 10 am to 5 pm.

Atalpuram में ADA Agra प्लॉट की कीमत क्या है?

Atalpuram में कीमत — से — तक है। यह कीमत अथॉरिटी द्वारा तय है, इसमें बोली नहीं लगती। पूरी लिस्ट ऊपर टेबल में दी गई है।

Nearby and related